Case Studies

 

15 Forge Place, Germiston, Glasgow

18 Storey building demolished at dawn The relatively straightforward explosive demolition of an 18-storey tower block has been made considerably...

131 Allan Street, Dalmarnock, Glasgow

It took just five seconds to demolish this 23-storey tower block in the east end of Glasgow. The site is...

Ardler – 2007

Safedem demolishes the last remaining Ardler multi-storey block It was the end of an era as the last of the...

Queens Court, Toryglen, Glasgow

It took just under 10 seconds and under 70 kilos of explosives to blow down the multi storey tower block...

Mitchellhill, Glasgow

On Sunday November 27th 2005, the skyline of Glasgow was dramatically changed for ever with the simultaneous demolition of the...

Marmion, Heriot & Montrose Courts, Paisley

These three 15 storey tower blocks had originally been tendered as a long reach demolition project. However having carefully examined...

Former Distillery,Castle Street, Dumbarton

Faced with a mixture of structures and construction types combined with a town centre location, the site purchasers turned to...

Rosyth

Probably the biggest demolition by controlled explosives in the world! The project is a concrete bunker with the following vital...

Greenfield and Kellyfield

This 16 storey tower block, built in 1969 was earmarked for demolition by Dundee City Council after it became clear...

Ministry of Defence Oil Storage Depot

This project called for the decontamination and dismantling of 32, 50,000 Litre oil storage tanks complete with associated pipework, gantries...

Knightswood Hospital Glasgow

Safedem carried out the demolition of Knightswood Hospital to clear the site for development. A traditional demolition job comprising asbestos...

Harefield & Kilspindie Courts

Described as “one of the most smoothly executed controlled demolition operations” in Dundee to date, two of the city’s redundant...

Page 2 of 3: 1 2 3